Preparation is Best
12/22/2017 (Permalink)
This SERVPRO loss was reported in a home that is under construction and did not have any house wrap on it. This lack of preparation naturally exposed all of the framing and plywood to the elements
Recent storms in the area had dropped a large amount of rain during the building process and as such, the main floor had soaked up a significant amount of water.
As winter approached and temperatures became cooler the floor was unable to dry out. The combination of the wet flooring along with the crawlspace not having the proper ventilation needed encouraged mold to start to grow on the bottom of the sheeting.
The SERVPRO inspection showed that the whole main level had mold on the bottom side of the plywood. Mold Remediation was necessary but the contractor was instructed to wrap the house correctly before any work began.